The Plant has been designed to produce the desired output of 250 Liters per Hour.
Raw Water analysis : The System is designed on following raw water analysis as indicated below ;
Parameter | Results | |
Raw water source | Bore Well | |
pH | Not Known | |
TDS | Upto 2500 Mg/L | |
S.Solids | Not Known | |
Chlorides | Not Known | |
Fluoride | Not Known | |
Total Hardness | Not Known | |
Calcium | Not Known | |
Mg | Not Known | |
Total alkalinity as CaCo3 | Not Known | |
Silica as Si O2 | Not Known | |
Sulphate as SO4 | Not Known |
We have designed this system to produce permeate flow 250 Liters per hour. The treated water quality as required i.e pH 7-8 after correction ,TDS <100 PPM & Hardness < 50 PPM can be achieve , subject to the feed water quality is the same as specified above .In case of any change in the quality of raw water it may have implication on operating parameters or on end results of the system.
The system of recovery is properly maintained corresponding to the raw water TDS. Plant feed water limiting conditions as mentioned below are strictly maintained,
Parameter | Results | |
Turbidity | < 1 NTU | |
Free Chloride | Nil | |
Oil & Grease | 1 no | |
Iron | <0.1 PPM | |
SDI | <4.0 | |
Temperature | < 45 degree C | |
Membrane Housing 4080 E2 FRP | 1 nos |
S.No | Description | Make | Qty | Remaks |
1 | Raw Water Pump | Kirloskar | 1 No | Capacity 1 m3M |
2 | Sand Filter | Aventura or Pentair | 1 No | H 1200 MM & Dia 250 MM Flow Rate 1500 Liter per hour |
3 | Carbon Filter | Aventura or Pentair | 1 nos | H 1200 MM & Dia 250 MM Flow Rate 1500 Liter per hour |
4 | Anti-scalent Dosing System | E doze | 1 Set | Capacity 0-06 LPH |
5 | Micon Filter Hsg 20” | Big Blue Imported | 2 nos | 20” Big Blue with 4” Dia |
6 | Micron Filter | 2 nos | 20” * 2” Dia | |
7 | High Pressure Pump | Sumo/ Nangfang/CRI | 1 nos | Capacity 1 M3 |
8 | Membrane | Film Tech/ Hydronautics / Torrey | 1 no | Size 4” * 40” |
9 | Membrane Hsg | Water Life | 1 no | 1 Elements in Hsg |
10 | C I P System | Sharp/KBL | 1 Set | Optional at extra cost |
11 | Electric Control Panel LED Base | 1 Set | ||
12 | Flow Meters | Flow Star/ UKL | 2 Nos | |
13 | Pressure Switches | Denfoss Or Equ. | 2 Nos | Low & High Pressure |
14 | Pressure Gauges | H Guru 2 Nos | ||
15 | Pipe Fittings | 1 Lot | Upvc all over | |
16 | Membrane Skit | 1 No | MS fabricated with epoxy paint or SS 202 | |
17 | Online Conductivity Meter | Aster | 1 No | For Measuring On line Conductivity Optional at extra cost s |
Flow Rate Treated Water | 250 LPH based on TDS level upto 2500 PPM |
Raw Water Pump | Specifications Horizontal Centrifugal |
Power Required | 0.5 HP |
Make | Kirloskar & Eqv |
Quantity | 1 No |
Specifications
Make | Pentair / Aventura | Material of Construction | FRP | |
Dia & Length | 10*54 | Testing Pressure | 6 Kg/cm2 | |
Opening | Top | Quantity | 1 No | |
Valve | Multiport Type Lever Type | Size | ¾ Inch | |
Maximum Flow | 2000 LPH | Media | Gravel, Pebbles ,Quartz Sand ,Anthracite etc |
Specifications
Make | Pentair / Aventura | Material of Construction | FRP 10*54 | |
Testing Pressure | 6 Kg/cm2 | Opening | Top | |
Quantity | 1 No | Valve | Multiport type, Lever tpye | |
Size | ¾ Inch | Maximum Flow | 2000 LPH | |
Carbon | Acid wash with 1100 + ID valve |
Specifications
Cartridge Filter & Housing Big Blue Housing
Make | Imported in PP | Length & Diameter | 20”*4” | |
Quantity | 2 Nos | Cartridge | Make Ametek USA in PP | |
Length | 20” | Micron Rating | 05 Micron | |
Quantity | 2 Nos |
Specifications
Cartridge Filter & Housing Big Blue Housing
MOC | PP | Capacity | 06 LPH | |
Pressure | 10 psig | Qty | 1 No | |
Ø Make | E Doze |
Specifications
Cartridge Filter & Housing Big Blue Housing
MOC | Stainless Steel | Type | Vertical | |
Flow Rate | 1 M3 | Power Required | 1 Phase ,1.1 Kw | |
Make | Sumo/CRI/Nangfang |
Specifications
Type | Spiral Wounded | & Lengt | 40*40 | |
No membrane | 1 No | Recovery | Approx 30 % | |
Make of membrane | Dow/ Hydranautics | Salt rejection | 60 % |
Specifications
MOC | FRP Composite | Pressure Vessels | 1 No | |
No of membrane per vessel | 1 No |
Specifications
With R W Pump & FRP Tank | 1 No , 100 Liter |
Specifications
Complete starters, overload relays , single phase prevention for pump. Voltmeter , Ammeter , MCB’s , indicating lights | Push buttons | Rocker Switches for Dozers | Incomers, Auto- Manual Switches |
Specifications
Rota Meter | 2 nos (permeate & Reject line ) | Make | Flowstar , Vats | |
Digital TDS/ Conductivity Meter | 1 no at extra cost | Make | Vats India | |
Pressure Switch | 2 Nos | Make | Indfoss/Denfoss | |
Pressure Gauges | 2 Nos | Make | Gluck/ Guru |
Pipelines upvc NRV’s pressure relief valves , where needed . The system with be on common MS base frame or SS as per Direction of Client.
The following terms and conditions shall apply to this order. Payment 50 % advance along with purchase order.40 % against Performa invoice before delivery.Bal 10 % after Erection & Commissioning. Validity This offer is valid for acceptance till 60 days from the date of offer. Warranty 12 months from the date of delivery / installation . Consumable Like chemical and filters will be on chargeable basis during warranty period. Prices are excluding taxes Testing / Inspection Any charges for inspection / testing would be on the client' account. Facilities at site The buyer at his cost shall arrange the following facilities at site available.
The requisite utilities, manpower and raw materials should be available at the time of installation and commissioning. All other terms and conditions shall be discussed and agreed / finalization mutually at the time of agreement.
The following are specifically excluded from our scope of work: All process inputs, utilities such as tube well for water, power supply and distribution system, inlet –outlet-piping ete.
Fire Fighting Equipment.
All civil works including building, shed, foundations, roads, ramps, storage tanks etc
Warehousing, storage and safe custody of equipment and other plant items received at site.
Temporary power supply during construction and erection of plant
Effluent Treatment.
Any other services / equipment not specifically mentioned.
Model of the plant.
Our Termination Points :
Raw Water Pump Suction
Outlet of permeate water and reject waterv
Overflow and drains of respective dosing tank & vessel